Skip to contents

Create a bay segment assessment table for the 2022-2026 reasonable assurance period

Usage

show_ratab(
  epcdata,
  yrsel,
  bay_segment = c("OTB", "HB", "MTB", "LTB", "RALTB"),
  partialyr = F,
  outtxt1 = NULL,
  outtxt2 = NULL,
  outtxt3 = NULL,
  outtxt45 = NULL,
  txtsz = 13,
  width = NULL
)

Arguments

epcdata

data frame of epc data returned by read_importwq

yrsel

numeric indicating chosen year

bay_segment

chr string for the bay segment, one of "OTB", "HB", "MTB", "LTB", "RALTB"

partialyr

logical indicating if incomplete annual data for the most recent year are approximated by five year monthly averages for each parameter

outtxt1

optional text for NMC action 1, added to the outcome column

outtxt2

optional text for NMC action 2, added to the outcome column

outtxt3

optional text for NMC action 3, added to the outcome column

outtxt45

optional text for NMC actions 4 and 5, added to the outcome column

txtsz

numeric indicating font size

width

optional numeric value indicating width in inches

Value

A flextable object showing the reasonable assurance compliance of the bay segment for the selected year within the five-year period.

Details

Choosing bay_segment = 'RALTB' will not work with epcdata and additional data are needed to use this option.

Examples

show_ratab(epcdata, yrsel = 2023, bay_segment = 'OTB')
#> Registered S3 method overwritten by 'ftExtra':
#>   method                  from     
#>   as_flextable.data.frame flextable

Bay Segment Reasonable Assurance Assessment Steps

DATA USED TO ASSESS ANNUAL REASONABLE ASSURANCE

OUTCOME

Year 1 (2022)

Year 2 (2023)

Year 3 (2024)

Year 4 (2025)

Year 5 (2026)

NMC Action 1: Determine if observed chlorophyll-a exceeds FDEP threshold of 9.3 ug/L

No (7.1)

No (6.2)

All years below threshold so far, not necessary for NMC Actions 2-5

NMC Action 2: Determine if any observed chlorophyll-a exceedences occurred for 2 consecutive years

No

No

All years met threshold, not necessary for NMC Actions 3-5

NMC Action 3: Determine if observed hydrologically-normalized total load exceeds federally-recognized TMDL of 486 tons/year

N/A

N/A

Not necessary due to observed water quality and seagrass conditions in the bay segment

NMC Actions 4-5: Determine if any entity/source/facility specific exceedences of 5-yr average allocation occurred during implementation period

Not necessary when chlorophyll-a threshold met